New Interior

 A new first floor was inserted. The external walls and the roof were lined with insulation. The blocked doorway just above firts floor level between the tower and the body of the church was reopened. A main stair, lift and WC on each floor were installed atth front of the building, with a secondary stair serving fitted into the former vestry at the rear.

On the ground floor, an open plan office, the north transept was closed to form a small room for private meetings. A small kitchen was also formed.

The whole first floor is open for conferences, meetings, training and social events.  



before new floor was inserted
before new floor was inserted
Slots cut for first floor steel beams
Slots cut for first floor steel beams
South transept window cill lowered
South transept window cill lowered
South transept new jambs at lowered cill
South transept new jambs at lowered cill
West end:blocked door to tower re-opened
West end:blocked door to tower re-opened
New First Floor
New First Floor
Lobby general view looking up
Lobby general view looking up
steel for internal stair to tower floor
steel for internal stair to tower floor
Handrail on new main stair
Handrail on new main stair
New stairs and relocated pulpit
New stairs and relocated pulpit
First Floor windows complete
First Floor windows complete
general view on first floor, trusses painted
general view on first floor, trusses painted
 
 
 
 